Files
Deep-Package-Inspection/docs/log/2026-07-08-1547-e.md
T

1.2 KiB

Iteration Log - 2026-07-08-1547-e

  • Trigger: e (enhance)
  • Requested: Align core requirements status with backlog.
  • Touched Sections: /plans/next-enhancements.md

Steps Taken

  1. Read /plans/next-enhancements.md.
  2. Verified implementation status of the 9 core project requirements:
    • Req 1: Admin "View As" Mode Banner (Completed)
    • Req 2: Admin login redirection issues (Resolved)
    • Req 3: Clickable IP/MAC with Source Agent (Completed)
    • Req 4: Time ranges & active status synchronization (Completed)
    • Req 5: Time filters: All, 5m, 30m, 1h, 24h, 7d, 30d (Completed)
    • Req 6: English translations (Completed)
    • Req 7: Duplicate components cleanup (Completed)
    • Req 8: Accessing IPs pop-up details on Apps (Completed)
    • Req 9: Release all limits/thresholds (Completed)
  3. Appended these completed tasks as Section 0 (Completed Core Requirements) with status [DONE].
  4. Kept the 15 future [TODO] tasks intact.

Current State

  • Backlog: 9 completed tasks ([DONE]), 15 active tasks ([TODO]).
  • Build Integrity: Compile check verified.